Welcome~Aster Far Infrared Heating
muxi6800@163.com  Language :  Chinese   English

News

2019 Air Pollution Comprehensive Treatment Work Plan in Shijiazhuang City Of China

In order to comprehensively implement the decision-making arrangements of the Party Central Committee, the State Council, the provincial party committee and the provincial government to win the blue sky defense war, comprehensively carry out comprehensive air pollution control, promote the continuous improvement of the city's ambient air quality, and formulate this work plan.

1. The overall idea

Adhere to the spirit of Xi Jinping's ecological civilization, study and implement the spirit of the Party's 19th and 19th Central and 3rd Plenary Sessions, implement the provincial and municipal "two sessions", and improve the environmental air quality as the core, and make overall efforts and precision. We will make in-depth adjustments to industrial structure, energy structure, transportation structure and land use structure, focus on the removal of production capacity and retreats, loose coal remediation and clean substitution, motor vehicle pollution prevention, comprehensive management of dust and non-point source pollution, and deep treatment of industrial pollution. Responding to heavy pollution, continue to strengthen environmental law enforcement and scientific and technological support, improve the assessment of rewards and punishments and accountability mechanisms to ensure that the blue sky defense battle is won.

2. Work goals

In 2019, the average concentration of PM2.5 in the city decreased by 7% compared with 2018, reaching 67 μg/m3. The composite index decreased by 9% compared with 2018, reaching 6.85, and the ratio of excellent days reached 44.7%.

3. Work measures

(1) Focusing on the ability to go to the production capacity and retreat to the city

1. Unswervingly resolve excess capacity.

Continue to reduce excess capacity of steel, coking, cement, etc., prohibit new capacity projects, prevent the resurgence of “strip steel”, actively promote the elimination of coke ovens with a height of 4.3 meters and below, and a service life of more than 10 years, and accelerate the independence. The coking enterprises eliminated the exit. Before the end of 2019, the cement production capacity was reduced by 2.6 million tons, the ironmaking capacity was 480,000 tons, the coke production capacity was reduced by 500,000 tons, and the thermal power production capacity was 28,000 kilowatts. Improve the supervision mechanism, implement 24-hour remote monitoring, and resolutely prevent the resumption of production of the equipment.

2. Continue to promote the rectification of “thermal power besieged city” and the relocation of key polluting industrial enterprises.

Strengthen coordination and cooperation with relevant departments of the province, and start relocation and transformation of heavily polluting industrial enterprises such as iron and steel, chemicals and pharmaceuticals located in the main city. Key enterprises that have no relocation value and have obvious environmental impacts should be shut down (except for enterprises that must rely on cities or directly serve cities); other industrial enterprises that are not suitable for development in the main urban area should also be included in the scope of relocation. Accelerate the formulation of alternatives for shutting down and heating coal-fired units listed in the thermal power city rectification plan, and focus on cracking down the phenomenon of “thermal power siege”. By the end of 2019, 8 enterprises were relocated and reorganized, and the provincial government was actively engaged in the relocation and renovation of Shijiazhuang Iron and Steel Co., Ltd., and Shigang was urged to complete the relocation on time. Enterprises that have not completed the relocation of the city after the deadline will be suspended.

(2) focus on the loose coal remediation and clean alternative battle

3. Actively and steadily promote clean and warm.

Adhere to ensuring that the people warm the winter as the bottom line, to ensure the energy supply as the premise, make overall plans, change the gas, and set the electricity to change. In the 2019 heating season, we will strive to complete 349,400 rural clean heating renovations, and realize the loose coal in the whole plain area. "Cleared."

For areas that cannot be covered by clean heating, establish a clear account for the village, and do a good job in clean coal promotion.

Improve the clean coal supply security system and do a good job in clean coal supply.

The area where the clean and heating renovation is completed is designated as a high-polluting fuel-free zone and a long-term monitoring mechanism is established. Strictly prevent re-ignition of loose coal in areas where clean heating and clean coal have been implemented.

Expand the coverage of central heating. By the end of October 2019, the heating rate of central heating and clean energy in the built-up area will reach over 90%.

Aster far infrared heating products, national patent technology, high efficiency, energy saving, safety and environmental protection, has passed the national laboratory testing, EU CE certification, RoHS, EMC electromagnetic compatibility testing, exported to Europe, is an ideal electric heating products.

Learn more, please click here: http://www.asterheating.com



Categories

Contact

CONTACT US

Contact: Asterheating

Phone: +86-024-53816768

Email:muxi6800@163.com

Add:No.46 Shendongsi Road, Shenfu New Zone, Liaoning Province,China.

Scan the qr codeClose
the qr code